Tel: +86-158-50767350   E-mail: admin@brimahoist.com
Overhead Crane Self-Designed European End Carriage/ End Truck with Motor
Home » Products » Crane Kits » End Carriage » Overhead Crane Self-Designed European End Carriage/ End Truck with Motor

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Overhead Crane Self-Designed European End Carriage/ End Truck with Motor

End Beam Trolley
Availability:
Quantity:

Overhead Crane Self-Designed European End Carriage/ End Truck with Motor


It should be installed approaching to the transmission position, and installed on the same side of the electrie deviceIt should be installed far away from the strenuous vibration area as well as avoid the point of high temperature heat source asfar as possible.Pay attention to the convenience ofmaintenance on it.Choose the appropriate suspension way.It should be selected the model and the size of appropriate suspension support according to the field situation;The standard length of suspension distanee of it is 1200mm, and the longest distance is not allowed to surpass 2000mm.Cautions in installation to determine the positions of finction sections such as power supplying section, the inflation section and so on according tothe installation schematic drawing, and to number it according to installing positions.The first conductor rail which is installed must be suspended with fixed the swing from clamp, so as to taking the datum ofcalibrating entire line to be straight.


When the first conductor rail (duet) is installed, it should be adjusted the parallelism with the movement track center line ofthe electric device not to be larger than 1.$mm/1000mm. the following installed conductor rail should be guaranteeddefinitely both with the straightness of first conductor rail and the straightness of movement track of electric device not to belarger than 1.5mm/1000mm.


Rechecking should be done to the entire line after finishing the installation. lf the conductor rail (duct) installed first is nottaken as examine of the collating datum, it may be replaced with the floating swing from clamp.To examine the installation state of entire line, guaranteeing the entire line with the parallelism of electric device track andstraightness ofconductor rail (duet) itselfare not larger than l5mm.

end carriageend truck


BRIMA is a collection of hoisting & Crane research and development, design and manufacturing, sales and service as one of the emerging heavy industry enterprises for 20 years in England...

PRODUCT CATEGORY

QUICK LINKS

CONTACT US
 +86-158-50767350
    +86-512-57253378
 No.236,Tongzhou Road,Zhangpu Town,Kunshan city,Jiangsu Province,China
Copyright © 2024 Jiangsu Brima Hoisting Machinery Manufacturing Co., Ltd. All rights reserved. Sitemap | Privacy Policy | Supported by leadong.com